the airy scarf finished during yesterday’s marketing meeting (love being able to knit through it). my boss said its a good color for me.
a baby sweater for a co-worker in la. i think it still needs something so i’ll try embroidering a little flower on it maybe. i’m very happy with how the crochet trimmed turned out. i don’t crochet so even a single row of it makes me proud.
last night i did my gauge swatches to start the Jo Sharp sweater. the pattern calls for a size 6 needle to get the gauge (I’m using the yarn called for) yet i had to go done to a size 4 and i’m a tight knitter. i’ve heard this before at my LYS that the gauge on jo sharp yarns requires some really tight knitting. so, here i go after doing the giant blanket embarking on an adult sweater with size 4 needles! at least this is for me & i love the sweater.
© 2005 – 2011 Kathy Lewinski & Susan Cornish
10 Comments to I am getting things done..